" Skip to main content

Geisinger HealthPlex CenterPoint


Project Name: Geisinger HealthPlex CenterPoint
Location: Pittston, PA
Market: Healthcare
Application:  Humidification, Sterilization, Building Heat
Mechanical Engineer:  Martin Rogers Engineering
Mechanical Contractor: Worth and Company

Equipment:

  • (2) Hurst S-500 Scotch Marine Boilers, 200 HP
  • Hurst 150 psi Steam Duplex Boiler Feed
  • (2) Hurst Blowdown Separators with Aftercoolers
  • Schebler Model PA Boiler Flue
Download PDF

Centered between Scranton and Wilkes-Barre, the new Geisinger outpatient facility finds its home in Pittston Township, PA. The new facility will improve availability of many health services, ranging from surgeries to eye care. The Healthplex will be home to nine clinical suites that will specialize in surgery, orthopedics, urology, ophthalmology, imaging, and hybrid medical care.

During the design phase, mechanical contractor, Worth and Company, consulted with UEP Northeast on the boiler room design centered around two 200 HP Hurst S-500 Scotch Marine Boilers. UEP Northeast supplied a Hurst Duplex Boiler Feed along with two Hurst Blowdown Separators with Aftercoolers to go with the boilers. To finish out the project, we also supplied Schebler Model PA Boiler Flue which will ensure proper venting of the boilers for years to come!

Centergy

Author Centergy

More posts by Centergy

Leave a Reply