" Skip to main content

Bethune Elementary School


Project Name: Bethune Elementary School
Location: Philadelphia, PA
Market: K-12 Education
Application:  Building Heat
Mechanical Engineer:  Pennoni Engineering (Philadelphia)
Mechanical Contractor: Limbach

Equipment:

  • (2) Fulton Endura+ 4,000 Boilers
  • Armstrong Design Envelope Circulator Pumps
  • Enervex SMDS Dampers
  • Schebler EVD Boiler Vent
  • Schebler Engineered Stack
    • 2 pieces for 50+ foot chimney
Download PDF

In year one of a 5-year Guaranteed Energy Savings Act project with Ten Saves and Limbach360 for The School District of Philadelphia, Bethune Elementary School, CENTERGY supplied (2) Fulton Endura+ 4,000 MBH boilers with Armstrong Design Envelope Circulator Pumps. Fulton & Armstrong were able to offer STOCK equipment to help the team complete the work at Bethune ES in the first 3 months of the project having heat available for school year.

Additionally, we ensured proper venting of the system using Schebler EVD Boiler Vent and (2) 50’ welded sections of Schebler Engineered Stack. In the flue, you will find Enervex SMDS Dampers that will neutralize any draft variation and maintain the necessary boiler outlet pressure.

Centergy

Author Centergy

More posts by Centergy

Leave a Reply